Christian Böhner

Christian Böhner

PLM Architect, Domain Owner and PLM Enthusiast

Geseke · Paderborn area, Germany

Profile

I have been working in Product Lifecycle Management since 2001, and I am still as enthusiastic about it as on day one. I come from IT, but I think about PLM systemically: for me it neither stops at the borders of the engineering department nor at the limits of a single tool.

“I ♥ PLM” sticker on my laptop

I look at PLM holistically along the entire value chain, from requirements through development, change and release processes to manufacturing, suppliers and service. As PLM Architect, and since September 2025 also as Domain Owner PLM at dSPACE, I make sure that processes, data and systems fit together end to end, so that information reaches the people who need it without gaps. I have seen my role this way for a long time, even when it wasn’t on my business card.

My projects include the worldwide rollout of CONTACT CIMDatabase (now CONTACT Elements) at dSPACE for around 300 users, with three CAD systems, integration with Microsoft Dynamics 365 F&O, connected manufacturers and suppliers, and a consolidated item master. At Diebold Nixdorf I was responsible for a complex PLM landscape with 70 servers and consolidated it for 1,200 users at six sites worldwide. What drives me most is bringing business, IT and engineering together so that, in the end, everyone enjoys working with the system.

Skills

Experience

  1. since 01/2022

    dSPACE

    Paderborn, Germany

    • PLM Architect since 01/2022
      Architecture of the PLM landscape from within IT, thought through systemically and end to end along the value chain.
    • Domain Owner PLM since 09/2025
    • Lead of the global PLM program 10/2024 – mid 2025
    • Project: Rollout of CONTACT CIMDatabase (now CONTACT Elements) 01/2022 – 06/2024
      Worldwide use by around 300 users, integration of three CAD systems and connection to the ERP system Microsoft Dynamics 365 F&O. Consolidation of the item master for better data quality and fewer manual steps. Connection of manufacturers and suppliers, giving more flexibility during supply chain shortages.
  2. 09/2016 – 01/2022

    Diebold Nixdorf

    Paderborn, Germany

    • Application Manager global PLM Applications 09/2016 – 01/2022
      Worldwide service management, change and support for PLM enterprise applications. Responsible for a complex on-premises PLM landscape with 70 servers and numerous interfaces to other enterprise applications.
    • Project: Consolidation of the PLM landscape 03/2017 – 01/2022
      1,200 users at six sites worldwide, replacement of legacy PLM platforms and support for plant-specific bills of materials.
  3. 08/2001 – 09/2016

    Wincor Nixdorf

    Paderborn, Germany

    • Application Manager PLM/PDM Applications 03/2013 – 09/2016
    • Project: Introduction of Teamcenter Unified Architecture with NX 2011 – 2014
      Integration with Teamcenter Enterprise and replacement of I-DEAS. Rollout and training in Brazil, Singapore and several European sites.
    • Consultant PLM/PDM Applications and Processes 08/2004 – 02/2013
    • Software Engineer 08/2001 – 06/2004

Education

Vocational training as Software Technology Consultant (Fachberater für Softwaretechniken), qualified IT Specialist for Application Development (Fachinformatiker Anwendungsentwicklung)

Contact

Feel free to reach out via LinkedIn or email.